Throughout the semester, I've learn the explanation of all the actions of structural elements and the complete systems. I am now also able to recognize the perception of structure as an integral element of architecture.
Under lecturer guidance, I am now able to identify the problems that is encounter through the structure principles and interpret the application of the total integration of structural functions and actions with the overall design objectives. I am also able to analyse and provide pragmatic solutions to problems of a technological nature.
By the assignment given by the lecturer, I am able to understand the design concept of one building and get to know all of the aspect of design of a building.
Sunday, July 6, 2014
Estimating QSB 2134
Under Ms Azrina guidance for this subject, i am now able to identify, explain and distinguish the terminology that is related to estimating, measurement and unit rates at different stages of the construction. I am now also able to analyze the factors influencing the cost of the construction components, elements and project including pricing and preparation of tender on a measured work section of Bills of Quantities in a team. Also, I can identify the goodness and errors of a tender result.
Software Application for Quantity Surveying QSB 2813
Throughout the semester, I've learn to make use of the Cost X and Build Soft as a tool to complement my skills and knowledge in preparation of Bills of Quantities, Estimating, Tendering and Progress Payments.
From the assignment given by the lecturer, I've learn that there are still a lot more of software that share the almost same function as Cost X and Build Soft. and some of them is have much advance functions compare to Cost X and Build Soft. I wish to get to learn more of the softwares in the market.
While for the second assignment, it needs to be integrate with the other subject such as Measurement 4 and Estimating, which I find if very interesting, as I used all of the skills and knowledge throughout the semesters and previous semester to finish the assignment.
From the assignment given by the lecturer, I've learn that there are still a lot more of software that share the almost same function as Cost X and Build Soft. and some of them is have much advance functions compare to Cost X and Build Soft. I wish to get to learn more of the softwares in the market.
While for the second assignment, it needs to be integrate with the other subject such as Measurement 4 and Estimating, which I find if very interesting, as I used all of the skills and knowledge throughout the semesters and previous semester to finish the assignment.
Professional Practice 1 QSB 2615
Professional Practice 1, which is a subject that is prepared by the board of the course to prepare the semester 4 student get into internship.
This subject explain the qualification that is required for a Quantity Surveyor and its Professional Institution and Board. Also, I've learn of the duties of a Quantity Surveyor. I can also identify the roles of various parties involved in the building team and their construction contracts and contractual obligations. I've also learn the preparation of progress payment, variation orders, final accounts on completion of the contract works and contract administration that is related to Prime Cost and Provisional Sum. I am now able to evaluate the array of construction contracts between the client and the main contractor.
This subject explain the qualification that is required for a Quantity Surveyor and its Professional Institution and Board. Also, I've learn of the duties of a Quantity Surveyor. I can also identify the roles of various parties involved in the building team and their construction contracts and contractual obligations. I've also learn the preparation of progress payment, variation orders, final accounts on completion of the contract works and contract administration that is related to Prime Cost and Provisional Sum. I am now able to evaluate the array of construction contracts between the client and the main contractor.
Measurement 4 QSB 2125
Throughout the semester, under Sr Chang guidance, I've recognized the items that are measurable for surface water drainage, sewerage works, bored piles, and other types of external works.
Also, I am now able to distinguish and illustrate the description in writing up the description in accordance to the design of the external works.
And, I am able to evaluate the relationships between the Specification, Drawings and Bill of Quantities in Tender Documents of all the external works.
The assignment prepared by Sr Chang is very helpful for me as will be going to the 6 months internship this coming August, throughout the assignment, I've learn the very importance of group work and the meaning of group work, as measurement for a whole building require communication between the group members to get all of the information that you need for the calculation. Also, I am now refer back to Standard Method of Measurement 2 more than the previous semesters.
Also, I am now able to distinguish and illustrate the description in writing up the description in accordance to the design of the external works.
And, I am able to evaluate the relationships between the Specification, Drawings and Bill of Quantities in Tender Documents of all the external works.
The assignment prepared by Sr Chang is very helpful for me as will be going to the 6 months internship this coming August, throughout the assignment, I've learn the very importance of group work and the meaning of group work, as measurement for a whole building require communication between the group members to get all of the information that you need for the calculation. Also, I am now refer back to Standard Method of Measurement 2 more than the previous semesters.
Subscribe to:
Posts (Atom)